Centinela Valley USD
Hawthorne High School, Leuzinger High School
Descriptions
C Below
Prior to upcoming construction, C Below identified all lines campus wide utilizing standard utility locators. Using Ground Penetrating Radar (GPR), we confirmed utility locations and depth estimates. In addition to traditional methods, we used sond transmitters, and cctv pipe inspection to get a complete picture of what is beneath the surface. With the help of GNSS technology, we provided composite utility drawings drawings in AutoCAD format that our client could provide architects and contractors designing and working on the campus improvements.
Summary
- Type:
- K-12
- Definition:
- Study/Analysis
- Budget:
- $100,000