Calvin College Spoelhof Fieldhouse Complex
MI View MapCompleted: 05/31/2008
Classic Engineering assisted Steel Supply & Engineering by providing the steel erection bracing design for the new fieldhouse. Utilizing temporary columns, cable guys with helical earth anchors, the two main roof trusses were assembled in the air in three sections. Lateral stability of the entire structure was also provided by the bracing until the exterior masonry shear walls were completed.
Other Companies On This Project
- Materials Testing Cons.. Construction Materials Testing
- Acoustics By Design Audio Visual Design
- D.C. Byers Company/Gra.. Waterproofing
- East Muskegon Roofing .. Roofing
- Fence Consultants of W.. Fence and Gates
- Van Haren Electric Inc Electrical Contractor
- Classic Engineering Structural Engineering
- West Michigan Lighting Supplier
