Portfolio

JW Marriott

235 Louis Street NW Grand Rapids MI 49503 View Map

Completed: 02/28/2008 Budget: $12,143,353

Classic Engineering assisted Steel Supply and Engineering with structural steel connection design calculations and truss erection sequencing.  Classic also assisted Reliable Fire Protection with the Fire Protection System design.

Other Companies On This Project

Your Ad Here