Login: Password:
Forgot your login?

Construction News Service

CNS Newsroom Login

Forgot your password? Forgot your username? Create an account
Newsroom Login
Open/Close

Various Road Reconstruction Projects - Allegan County, MI.

Description

Driesenga & Associates, Inc. has worked on a number of road reconstruction projects for the Allegan County Road Commission. Examples projects are 28th Street, 121st Avenue, 144th Avenue, 25th Street, 32nd Street, 138th Avenue, 43rd Street, and 127th Avenue. The projects generally entail upgrading an existing gravel road to an all season paved road. The proposed new design is required to meet an AASHTO 55 mile per hour design speed for horizontal and vertical alignment. Several projects encountered unsuitable soils and required geotechnical engineering to bridge these materials, while minimizing the project costs. The Driesenga & Associates, Inc.’s (D&A) team provides geotechnical engineering, topographic survey, civil design, and materials testing services on these projects. Specific tasks include design engineering, soil borings, plan preparation, verification of pavement design, bidding documents, and opinion of probable cost to meet the requirements of the Allegan County Road Commission. We have also provided as needed materials testing of both on-site and laboratory testing for soils, concrete, and HMA.
<< Back

Summary

Type: Municipal
Definition: Renovation
Date Completed: 09/25/2008

Companies On This Project

Copyright © 2008. Construction News Service, Inc. All Rights Reserved.