Summary

Size:
500 Linear Feet
Type:
Roads / Highways
Budget:
$1.33 Million
Date Completed:
11/04/2008

Description

Replaced 500 linear feet of retaining wall that had collapsed.  Restored 200 linear feet of retaining wall on the ends of the wall.  The retaining wall backs up to the Fulton Street Cemetery and special consideration was given so as not to disturb grave sites.  The project included steel soldier piling and wood lagging for the entire length of the project.

Companies On This Project