Summary
- Size:
- 500 Linear Feet
- Type:
- Roads / Highways
- Budget:
- $1.33 Million
- Date Completed:
- 11/04/2008
Description
Replaced 500 linear feet of retaining wall that had collapsed. Restored 200 linear feet of retaining wall on the ends of the wall. The retaining wall backs up to the Fulton Street Cemetery and special consideration was given so as not to disturb grave sites. The project included steel soldier piling and wood lagging for the entire length of the project.