Description
THE KING CO., INC. was selected by Rockford/Pepper Construction to design-build a temporary earth retention system to support the adjacent roadways. This allowed the construction of the GRAM deep concrete spread foundations. A combination tangential auger cast wall and soldier pile wood lagging wall was utilized at different portions of the site. With maximum excavation depths reaching 32-feet, and deflection criteria less than 1-inch to eliminate any settlement of adjacent structures, THE KING CO., INC. was successful in the performance of this project.
Summary
- Type:
- Municipal
- Date Completed:
- 12/03/2007
Companies On This Project
- Design Plus Architectural
- Materials Testing Cons.. Material Testing
- WPF Engineering Electrical Engineering
- Acoustics By Design Acoustical Design
- D.C. Byers Company/Gra.. Waterproofing
- Fence Consultants of W.. Fence and Gates
- Kerkstra Precast Precast Concrete
- Ritsema Associates Drywall
- THE KING CO., INC. Earth Retention
- Pioneer Construction Steel Erection