<< Back

Location

3909 Baldwin St Hudsonville MI 49426 View Map

Summary

Size: 67,678 sq ft
Green: Sustainable
Market Segment: Education
Budget: $13.5 million
Date Completed: 08/01/2006

Project Contributors

Hudsonville Public Schools Georgetown Elementary

Description

The Georgetown Elementary School is a part of the $31.5 million bond issue that Triangle completed for Hudsonville Public Schools. This elementary facility creates a superior educational environment for its K-5 students due to it’s design as well as construction methods.

The classrooms use a volume speech enhancement system to help younger students hear clearly and learn efficiently. In addition to classrooms, space was dedicated for special needs, art and music. For a hands-on approach to education, students can access an outside science deck. The school site allows for separate student and parent drop-off locations to maximize safety. Three separate playgrounds, a soccer field and a T-ball field round out this facility.

The building utilizes the earth’s natural temperatures through a geothermal heating and cooling system which minimizes operating costs. Terrazzo floors were installed throughout the building — designed to last for the life of the facility.

 
© 2007-2008 Triangle Associates, Inc.  | 3769 3 Mile Road NW | Grand Rapids, MI 49534 | 616-453-3950